
Mongol Gan Complex 1 Project
In April 2014, QMC LLC initiated the “Mongol Gan Complex 1” project to establish a mining and metallurgical complex in Darkhan-Uul province. The project is located within the premises of Darkhan Metallurgical Plant JSC and is designed to produce 350,000 tons of steel rolled products annually.
The feasibility study for the project was developed in compliance with the “Basic Requirements and Acceptance Procedure for Feasibility Studies in the Heavy Industry Sector”, as approved by the Minister of Mining and Heavy Industry.